Ensuring that the final results meet desired standards is called _________ control.
A) feedforward
B) feedback
C) concurrent
D) feedmore
Correct Answer:
Verified
Q1: Which of the following is controlled by
Q2: Which of these is NOT needed in
Q3: The process of measuring performance and taking
Q4: _ control occurs through self-discipline and self-control.
A)
Q6: Measuring performance and _ are parts of
Q7: What is the second most important step
Q8: Ensuring clear directions and needed resources before
Q9: Which of the following is controlled by
Q10: Work inputs are controlled by which controls?
A)
Q13: Focusing on substantial differences between actual and
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents