If the auditor concludes that the CUER is 5% at a 8% sampling risk, this means that the exception rate in the population is no greater than 5% with an 8% risk of the exception rate exceeding 5%.
Correct Answer:
Verified
Q63: Which of the following represents the best
Q65: Auditors often use the _ to determine
Q68: Which of the following is the exception
Q69: The exception rate the auditor will permit
Q71: In testing controls, an overreliance on internal
Q79: The upper limit of the interval estimate
Q91: Place the following steps in their proper
Q93: When analyzing exceptions, the auditor should keep
Q95: The acceptable risk of overreliance
A) is the
Q97: The relationship of tolerable exception rate (TER)
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents