Acceptable risk of overreliance is the risk that the auditor is willing to take in accepting a control as effective when the True population exception rate is greater than the estimated population exception rate.
Correct Answer:
Verified
Q101: Which of the following results in a
Q103: The auditor must use the same TER
Q104: When defining the population,
A) it may be
Q106: The sample exception rate equals
A) the number
Q107: One way to evaluate sampling risk when
Q111: The tolerable exception rate is the rate
Q115: When determining tolerable exception rate (TER),
A) the
Q118: When planning the audit sample, the _
Q119: When choosing the appropriate acceptable risk of
Q123: You are determining the appropriate sample size
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents