There are four resources and four jobs to be done. Assume there must be one-to-one matching between jobs and resources. The time required for each resource to do each job is as follows:
After the row and column reductions, what is the resulting entry in the new table for assigning resource 4 to job D?
A) 0 hours
B) 2 hours
C) 3 hours
D) 6 hours
E) 9 hours
Correct Answer:
Verified
Q64: In an assignment model where there are
Q66: The president of a consulting firm wants
Q68: The following table contains information about
Q69: There are four resources and four
Q70: The president of a consulting firm wants
Q73: For the jobs listed below, which processing
Q74: The following table contains information about
Q75: The president of a consulting firm wants
Q76: There are four resources and four
Q80: A major difference between manufacturing and service
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents