A lot can be "accepted" or "rejected" in a double-sampling plan:
A) after one sample is taken.
B) after two samples are taken.
C) only after two samples are taken.
D) All choices are correct.
E) Only after one and after two samples are taken is correct.
Correct Answer:
Verified
Q16: Acceptance sampling plans must specify the lot
Q17: The ability of an acceptance sampling plan
Q18: Which of the following is associated with
Q19: Which of the following is associated with
Q20: In a double-sampling plan, a second sample
Q22: A quality inspector for Alpha-Beta Co. is
Q23: Which one of the following would not
Q24: An AOQ curve shows:
A) the maximum quality.
B)
Q25: A Type II (beta) error occurs when:
A)
Q26: The AQL indicates:
A) acceptable quality level.
B) average