In a stopwatch time study, the number of cycles that must be timed is a function of:
(I) the variability of observed times.
(II) the desired accuracy for the estimated job time.
(III) the desired level of confidence for the estimated job time.
A) I only
B) I and II only
C) II and III only
D) I, II, and III
E) I and III only
Correct Answer:
Verified
Q71: In a stopwatch time study, the average
Q72: The methods analysis chart which describes the
Q74: In motion studies, a therblig is a:
A) charting
Q126: Determining the number of cycles to observe
Q127: Which of the following concerns is not
Q130: A simo chart includes:
A)delay.
B)storage.
C)transportation.
D)left/right hand movements.
E)inspection.
Q136: The symbols for operation, storage, transportation, inspection,
Q144: When performing a time study, the analyst
Q153: Which is not a requirement for an
Q154: What is the effect of an increase
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents