In assembly-line balancing,the theoretical minimum number of workstations is:
A) the ratio of the sum of all task times to cycle time.
B) always (when a fraction) rounded upward to the next larger integer value.
C) not always possible to reach when tasks are actually assigned to stations.
D) all of the above.
E) none of the above.
Correct Answer:
Verified
Q99: A work cell is required to make
Q102: The assumptions necessary for a successful product-oriented
Q105: If the schedule calls for the production
Q106: A production line is to be designed
Q107: A production line is to be designed
Q261: Identify the four requirements for cellular production.
Q267: What are the advantages of focused factories?
Q281: Which one of the following is NOT
Q288: Cycle time is computed as:
A) desired output
Q300: A production line is to be designed
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents