There are stages in the Database Life Cycle (DBLC) .
A) four
B) five
C) six
D) seven
Correct Answer:
Verified
Q24: "Should the existing system be replaced?" is
Q25: "What are the requirements of the current
Q27: In DBLC, the phase after the database
Q32: Selecting database management system (DBMS) software is
Q43: In the context of the database design
Q44: The feasibility study during the planning phase
Q50: The database initial study phase of the
Q53: Analyzing the company situation is part of
Q54: Installing the DBMS, creating the database, and
Q55: The design of the system's processes is