Change orders are seldom required and therefore do not need tracking.
Correct Answer:
Verified
Q3: A rewritable media storage generally not suitable
Q4: A photographic image of information, records, or
Q5: Legal standards for the retention of engineering
Q6: Revised drawings must be _ for future
Q7: Electronic drawings require approval authorities and are
Q9: It is recommended that you have a
Q10: An effective drawing/document management software requires setup
Q11: Even with extensive network drives, backups are
Q12: With the increased use of electronic data,
Q13: Changes to original drawings must be documented