Work Breakdown Structure (WBS) decomposes the project into ________ with different levels for activities.
A) segments
B) steps
C) a hierarchy
D) parts
Correct Answer:
Verified
Q30: The longest path in a project is
Q31: One of the challenges of project scheduling
Q32: The divide and conquer strategy leads to
Q33: Most of the tools and techniques for
Q34: The most popular and easiest tool for
Q36: Feasibility studies aim to discover whether the
Q37: One of the most difficult issues in
Q38: Characteristics for a good manager are all
Q39: The _ of the methodologies is what
Q40: Software development activities ? requirements gathering, analysis,