Producing the required information flow is part of the _____ phase of the Database Life Cycle (DBLC) .
A) database initial study
B) database design
C) operation
D) testing and evaluation
Correct Answer:
Verified
Q23: Discovery of user requirements, existing system evaluation,
Q24: "Should the existing system be replaced?" is
Q25: "What are the requirements of the current
Q26: Coding, testing, and debugging are part of
Q27: In DBLC, the phase after the database
Q29: Training principles and methodologies are planned during
Q30: The logical systems design is created during
Q31: The traditional Systems Development Life Cycle (SDLC)
Q32: Selecting database management system (DBMS) software is
Q33: The _ phase of the Systems Development
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents