The construction manager prepares a ???? estimate for the purposes of evaluation, subcontractor bids, productivity analysis, and so on.
A) Definitive
B) Bid
C) Fair cost
D) All of the above
Correct Answer:
Verified
Q58: Time sheets and equipment use reports are
Q59: The process of identifying and evaluating contractors
Q60: The ????type of schedule is graphically simple,
Q61: Owner involvement is highest during which project
Q62: Which of the estimates listed would occur
Q64: Which conclusion is correct based on the
Q65: The ????estimate would be prepared during a
Q66: What term(s) is (are) used to describe
Q67: What is (are) the benefits of meeting
Q68: The ????section of a bid package identifies