In a guaranteed maximum price (GMP) contract, costs above the GMP are covered by the contractor.
Correct Answer:
Verified
Q1: The term fast track--------
A) Is synonymous with
Q2: An advantage of the design/build approach is
Q3: In a pure construction management approach the
Q5: A unit-price contract provides an owner with
Q6: The choice of which delivery method is
Q7: Historically, a "master builder" was hired to
Q8: A project is rushed into design without
Q9: In which of the following project approaches
Q10: When assessing the risks applicable to a