Each time Maiertree Care hires a new employee it must wait for some period of time before the employee can meet production standards. Management is unsure of the learning curve in its operations but it knows the first job by a new employee averages 60 hours and the second job averages 48 hours. Assume all jobs to be equal in size.
Required:
a. What is the learning curve percentage, assuming the cumulative average-time method?
b. What is the time for a new employee to build 16 units with this learning curve using the cumulative average-time method? Assume the rate of learning factor is -0.1520.
Correct Answer:
Verified
Q70: Match the description with the appropriate term.
-An
Q71: Match the description with the appropriate term.
-A
Q72: Match the description with the appropriate term.
-Measures
Q73: Match the description with the appropriate term.
-The
Q74: Match the description with the appropriate term.
-A
Q75: Match the description with the appropriate term.
-A
Q76: Match the description with the appropriate term.
-A
Q78: Andrew Pallet Co., Inc. manufactures pallets for
Q79: Harry's Picture manufactures various picture frames. Each
Q80: Joe's Copy Centre hires a new employee.
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents