A leak in the roof ruined part of the data needed to complete the high-low method calculation. The high point related to 50 units indicates a total cost of $1,840. Total fixed costs are estimated at $1,200. The plans are to produce 60 units in the current month. How much is the variable cost per unit?
A) $11.20
B) $12.80
C) $20.00
D) $64.00
Correct Answer:
Verified
Q23: A line with a positive slope indicates
Q24: Which of the following is considered to
Q25: Use of a scatter-plot
A) mitigates the risk
Q26: Visualizing data on a scatter-plot
A) requires the
Q27: In creating a scatter plot using Excel,
Q29: DMX anticipates producing 500 license plates during
Q30: Given the graph shown below, what is
Q31: Anwar Industries has the following activity and
Q32: The regression method
A) uses only two actual
Q33: The "line of best fit" created in
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents