The process design team at a contract manufacturer in Thailand has broken an assembly process into 8 basic steps, each with a required time and predecessor, as shown in the table. There are 7.5 productive hours available in a day, and the manufacturer wishes to produce 400 units.
-The managers decide to balance the line by assigning tasks to workstations to fill up as much task time as possible. Break ties by assigning the longest task first. What task(s) should be assigned at the third workstation?
A) D
B) B, E
C) F
D) C, E, and G
E) Need more information to answer the question
Correct Answer:
Verified
Q62: The process design team at a medical
Q63: The process design team at a medical
Q64: The process design team at a contract
Q65: The process design team at a contract
Q66: The process design team at a contract
Q68: A tier-two supplier needs to produce 300
Q69: A tier-two supplier needs to produce 300
Q70: A tier-two supplier needs to produce 300
Q71: The table depicts an assembly line that
Q72: The table depicts an assembly line that
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents