Requirement Engineering is not concern with _.
A) requirement design
B) requirement elicitation
C) requirement analysis
D) requirement documentatio n
Correct Answer:
Verified
Q8: In which of the following type of
Q9: When should company stop the testing of
Q10: _ refers to a different set of
Q11: Who performs the Acceptance Testing?
A)software developer
B)end users
C)testing
Q12: Before handing over the software to the
Q14: When an expected result is not speci?ed
Q15: End result of Software Requirement Analysis is
Q16: Bug status is set to postpone due
Q17: Which Testing is performed ?rst?
A)black box testing
B)white
Q18: Veri?cation and Validation uses _.
A)internal and external
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents