A track of width 1 to 1.2 m constructed along the selected alignment to facilitate access to the area for inspection and detailed survey is known as
A) inspection trace
B) terrain
C) trace out
D) all of these
Correct Answer:
Verified
Q15: Traffic engineering deals with the
A)traffic operation
B)design and
Q16: The main disadvantage of concrete roads is
Q17: For design purposes, average daily traffic should
Q18: The main advantage of providing super-elevation is
A)to
Q19: The universally recognized factor which affects the
Q21: In detailed survey of a hill road,
Q22: The grand trunk (G.T.) road was constructed
Q23: The transverse contraction joints in unreinforced concrete
Q24: The transverse joint may be a
A)expansion joint
B)contraction
Q25: The Indian Roads Congress (I.R.C.) was set
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents