In this method approx. total length of walls is found in running metre and this total length multiplied by the rate per running metre of wall gives a fairly accurate cost.
A) annual repair
B) item rate estimate
C) approximate quantity method estimate
D) cubical content estimate
Correct Answer:
Verified
Q8: Obsolescence is the annual periodic payments for
Q9: Scrap value is the net annual letting
Q10: Approximate cost of a hostel building for
Q11: Cube rate estimate is less accurate as
Q12: For storeyed building plinth area estimate is
Q14: What will be the co-efficient of passive
Q15: Which model is used to compute the
Q16: What is the full form of ITA-2000?
A)information
Q17: In reverse engineering process, what refers to
Q18: In reverse engineering, what refers to the