For preparation of subgrade the existing subgrade should be dressed to a camber of 1 in 24 to 1 in 32.
Correct Answer:
Verified
Q1: Average number of blocks required for a
Q2: Before applying water proof mud plaster, the
Q4: For making bund ordinary mud wall gonda
Q5: A written report is more formal than
Q6: Which of these is usually written in
Q7: Which of these is not a formal
Q8: Into which of these types are formal
Q9: Which of these reports provide information without
Q10: _report provides rational findings.
A)informative
B)interpretative
C)routine
D)progress
Q11: Interpretative reports are also known as
A)recommendation reports
B)routine
Unlock this Answer For Free Now!