For 2nd class building superstructure shall be of 1st class brickwork in lime mortar.
Correct Answer:
Verified
Q9: For 2nd class building rain water pipes
Q10: Specification does not specify or describes the
Q11: The specifications are written in a language
Q12: General specification gives the nature and the
Q13: For first class building the foundation and
Q15: For third class building flooring shall be
Q16: For fourth class building the doors and
Q17: The water proof mud- plaster consists of
A)soil
B)janta
Q18: The brick work is not measured in
Q19: The excavation exceeding 1.5 m in width
Unlock this Answer For Free Now!