Which lean tool is considered the baseline for Kaizen events?
A) Determination of the sequence of operator tasks.
B) Standardization of work in the environment.
C) Calculation of Takt time.
D) Building an inventory of equipment needed for processes.
Correct Answer:
Verified
Q29: What would a project team do during
Q30: What would be the benefit of lot
Q31: Which technique would a continuous improvement team
Q32: Which of the following is NOT included
Q33: Which of the following choices is a
Q35: Which of the following would be an
Q36: A strategic business assessment leverages lean and
Q37: A CIPM, or continuous improvement process methodology,
Q38: Which phase of the PDCA cycle includes
Q39: PDCA encourages small tests within current processes.