Organizing flow is typically done with the critical path method and value stream mapping. Which of the following would NOT be included in the benefits of the critical path method when organizing flow?
A) The ability to acquire resources.
B) The ability to specify individual activities.
C) The ability to provide a graphical view of a project.
D) The ability to show activity precedence and interrelations.
Correct Answer:
Verified
Q4: The 7 classic wastes in lean include
Q5: Which type of process waste actually has
Q6: Which type of waste causes fluctuation in
Q7: A laminate processing plant has a high
Q8: The alignment of value-added work fragments means
Q10: Improving end-to-end flow would require identifying and
Q11: When visually managing the flow of a
Q12: An organization realized it was having difficulty
Q13: Scientific thinking and the scientific method are
Q14: The foundation of lean is stability and
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents