Measures and measurement systems are interdependent. Individual measures are tested in the measurement system to develop an analysis. Which metric element requires that the exact calculation of the metric be known?
A) The frequency of the measure.
B) The objective of the measure
C) The unit of the measure.
D) The formula for the measure.
Correct Answer:
Verified
Q10: Which quality measure for business results would
Q11: Lean cost and productivity measurements may include
Q12: Lean measurements such as safety, quality, financial,
Q13: Lean metrics typically fall into the two
Q14: Alignment of lean requires good measurement systems.
Q16: Internal measures should be aligned with the
Q17: Lean employees should be measuring the results
Q18: Removing waste reduces lead time. When measuring
Q19: Measuring flow requires measuring the time a
Q20: Lean accounting measurement is used to support
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents