Congestion is more in ________ layout.
A) process.
B) product.
C) fixed.
D) cellular.
Correct Answer:
Verified
Q2: The decision in a sequential sampling scheme
Q3: The symbol of rectangle shape represents the
Q4: _ is considered as the "essence of
Q5: _ is a vital aspect of the
Q6: Due to availability of _, quality of
Q8: Idle time is more in _layout.
A)process.
B)fixed.
C)cellular.
D)product.
Q9: Supervision required is more in _ manufacturing
Q10: Preparing the maintenance schedule of machineries becomes
Q11: Maintenance cost is more in _manufacturing system.
A)continuous.
B)intermittent.
C)hybrid.
D)job
Q12: Routing and scheduling is difficult in this_