__________ in the production planning and control is checking of work and taking corrective steps to ensure that each piece of work is completed at the right time.
A) expediting.
B) dispatching.
C) routing.
D) scheduling.
Correct Answer:
Verified
Q7: The legal functions that board of directors
Q8: _ attempts to provide an understanding about
Q9: _ function develops a physical relationship between
Q10: _ is the ratio of available goods
Q11: _ is the third step in the
Q13: Production planning starts with _.
A)scheduling.
B)routing.
C)dispatching.
D)expediting.
Q14: A production system uses _ to perform
Q15: The therblig symbol used for micro motion
Q16: The products that are made correctly and
Q17: The ability to rapidly increase or decrease
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents