True/False
Subgrade shall be well consolidated and compacted each with a camber of 1 in 60.
Correct Answer:
Verified
Related Questions
Q3: These are important roads within a district
Q4: What will be the maximum superrelevation in
Q5: What will be the ruling gradient in
Q6: What will be the minimum visibility at
Q7: What will be the width of metalled
Q9: First coat of bituminous painting shall be
Q10: If subgrade is soft or weak, a
Q11: Laying and consolidation shall be done during
Q12: Stone grits used for 1st coat and
Q13: As soon as sufficient length of premix