While solving an assignment problem, an activity is assigned to a resource through a square with zero opportunity cost because the objective is to
A) Minimize total cost of assignment
B) Reduce the cost of assignment to zero
C) Reduce the cost of that particular assignment to zero
D) All of the above
Correct Answer:
Verified
Q1: An assignment problem is considered as a
Q2: An optimal assignment requires that the maximum
Q4: The method used for solving an assignment
Q5: The purpose of a dummy row or
Q6: Maximization assignment problem is transformed into a
Q7: If there were n workers & n
Q8: An assignment problem can be solved by
A)
Q9: For a salesman who has to visit
Q10: The assignment problem
A) Requires that only one
Q11: An assignment problem is a special case
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents