Which of the following are included in the minimum requirements of an Erosion and Sediment Control Plan?


A) Site drawing of existing and proposed conditions
B) Narrative discussion of each erosion and sediment control measure, its purpose, construction sequence, and installation timing
C) Schedule for the inspection and maintenance of temporary and permanent stormwater management, erosion, and sediment control Best Management Practices
D) All of the above