The alternate name for Waterfall model is _________.
A) two-shot model
B) phase shot model
C) three-phase model
D) one-shot model
Correct Answer:
Verified
Q13: Project planning is an _ process.
A)continuous.
B)iterative.
C)time consuming.
D)conventional.
Q14: _ is a collection of projects that
Q15: The standard way of evaluating the economic
Q16: The costs that include the salaries and
Q17: Longer term benefits that are considered very
Q18: _ will indicate when expenditure and income
Q19: _ is the time taken to break
Q20: The calculation of _ is a project
Q21: Number of interrelated activities can be organized
Q23: The first phase of waterfall model is