Indicate below whether the following items are for a post completion project summary (S) or a post-installation system review (R):
a. ____ review project objectives and project life cycle
b. ____ determine if the system is doing what it was intended to do
c. ____ identify areas of good and poor performance on the part of the project team
d. ____ review project expenditures and profitability
e. ____ check for system design flaws and needed changes
f. ____ where necessary, suggest changes to procedures that would improve performance in similar, future projects.
Correct Answer:
Verified
Q22: Statement: Side-items are part of the environment
Q23: Statement: "Interaction design" refers to that aspect
Q24: Statement: In the implementation stage, the user
Q25: Statement: Side items are usually provided by
Q26: Statement: Phase D happens after the project
Q27: Statement: Phase D occurs after every project,
Q28: Statement: It is the sole responsibility of
Q29: Statement: Side items are extras and frills
Q30: Statement: The contractor may be required to
Q32: List three kinds of system conversion.
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents