Indicate below whether the following items are for a post completion project summary (S) or a post-installation system review (R):
a. ____ review project objectives and project life cycle
b. ____ determine if the system is doing what it was intended to do
c. ____ identify areas of good and poor performance on the part of the project team
d. ____ review project expenditures and profitability
e. ____ check for system design flaws and needed changes
f. ____ where necessary, suggest changes to procedures that would improve performance in similar, future projects.

Correct Answer:

verifed

Verified

Unlock this answer now
Get Access to more Verified Answers free of charge

Related Questions

Unlock this Answer For Free Now!

View this answer and more for free by performing one of the following actions

qr-code

Scan the QR code to install the App and get 2 free unlocks

upload documents

Unlock quizzes for free by uploading documents