The Design Professionals are always bound by the same Contract the Owner requires to Constructor to perform
Correct Answer:
Verified
Q7: For millennia
A) construction was almost all masonry
B)
Q8: Projects are usually done
A) with a single
Q9: Multi-prime Contracts
A) use more detailed contracts
B) require
Q10: In horizontal construction, we would expect the
Q11: Good Contracts spell out the duty for
Q13: If at all possible, avoid remedies imposed
Q14: The Owner expects the project to be
Q15: There are three broad types of construction:
Q16: Engineers are basically needed for horizontal construction
Q17: For centuries, the primary concern for design