Cardinal changes
A) can be based on scope or quantity
B) are important and should be done immediately
C) are normally small (like the bird) but can seriously change the schedule
D) are generally only involved in Federal work
Correct Answer:
Verified
Q10: There are two types of ambiguities-patent and
A)
Q11: Two clauses that help interpret the contract
Q12: The first level of interpreting a Contract
Q13: When submitting an RFI, the Contractor should
Q14: Although many may have a say, a
Q16: Liquidated damages result from
A) water damage usually
Q17: Means and methods will
A) always be provided
Q18: The Spearin Doctrine
A) relieves the Contractor from
Q19: The Spearin Doctrine relieves Design Professionals from
Q20: A Subcontractor cannot be held responsible for