Why should development projects have specific boundaries?
A) To be effective geographically
B) To be cost-effective
C) To be able to be evaluated
D) So that we know what is included in the project and what is not
E) So it can go through all the processes and stages of project planning
Correct Answer:
Verified
Q22: Which of the following is necessary for
Q23: How are things like negative environmental impacts
Q24: Adjusting all foreign exchange costs and benefits
Q25: What type of analysis is most appropriate
Q26: Why should development projects be planned carefully?
A)
Q28: What often happens after a development project
Q29: What is one of the methods used
Q30: What is a cost-benefit analysis characterized by?
A)
Q31: What is a cost-effectiveness analysis characterized by?
A)
Q32: What does the concept of development imply?
A)
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents