A technician is installing a new server with redundant power supplies in an ISO-certified datacenter. Which of the following should the technician perform?
A) Determine the maximum power load
B) Connect each power supply to separate power circuits
C) Connect each power supply to the UPS
D) Run a drop cord from an unused outlet and attach the power cords
Correct Answer:
Verified
Q521: An administrator is working on a server
Q522: Which of the following network solutions would
Q523: A company is designing its first DRP
Q524: A blade enclosure has a capacity of
Q525: The systems administrator is configuring the UAC
Q527: A systems administrator needs to ensure data
Q528: The systems administrator is configuring a new
Q529: An administrator is configuring an application server.
Q530: Which of the following connection types should
Q531: After determining slow access times were affecting
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents