A customer project deploys an 8-node OceanStor 9000 C Node with full front-end and back-end IB networking. The device is powered on and completes all front-end network ports. During customer front-end business switch interoperability testing, engineers will perform Oceanstor 9000 software installation and deployment. What is considered a best practice for this?
A) The engineer thinks the installation PC is connected to NIC1 to complete the software deployment, so connect the installation PC to NIC1
B) Direct Deployment of Software Without Disconnecting Front End Network and All Network Nodes
C) Software Deployment Before starting, the engineer configures a temporary back-end IP address on the back end network port B3-0 of the 9000 node (connected to the installation PC) Department DHCP server
D) The installation of PC directly through the network cable connected to the OM management network switch to complete the software deployment
Correct Answer:
Verified
Q232: A RedHat Linux 6 system includes a
Q233: When a Simpana backup client failed to
Q234: When installing Simpana, the client agent is
Q235: When using lvm to create a mirrored
Q236: Backup strategy development principles are based on
Q238: during the disaster recovery drill, to you
Q239: Which of the following is correct about
Q240: There are many services in the 8500
Q241: Which of the following statements are incorrect
Q242: An OceanStor 18000 storage system carries the
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents