Tough Hardware purchases raw materials and processes those purchases through a receiving / inspection process prior to stocking for production.Tough places 3 purchase orders for materials for production and receives the goods that day.The first PO is for 2,500 1 / 2" × 96" milling blanks at $2.75 each.The second is for 4,000 pieces of 48" × 96" × 1" sheet steel at $15.55 each.The third PO is for five 5 gallon drums of milling lubrication oil at $475.00 per barrel.
The receiving / inspection process is completed and the goods are transferred from Receiving Inventory to Raw Materials.The Receiving / Inspection Department assigns manufacturing overhead of $55.00 per purchase order as well as $2.75 per piece on metal goods and $35.00 per container on fluids.All labor is allocated through overhead.
(a)Write the journal entry to purchase and receive these items to Receiving Inventory on account.
(b)Assign overhead to the metal goods.
(c)Assign overhead to the fluid goods.
(d)Transfer all goods to Raw Materials Inventory.
Correct Answer:
Verified
View Answer
Unlock this answer now
Get Access to more Verified Answers free of charge
Q170: On March 1,Upton Company's Packaging Department had
Q171: A firm produces its products by a
Q173: The Brass Works is in the process
Q174: Austin Co.manufactures a product called Aster in
Q176: The cost of materials transferred into the
Q178: Fast-Flow Paints produces mixer base paint through
Q179: Stevens Company's inventory on March 1 and
Q180: Zang Co.manufacturers its products in a continuous
Q192: The cost of energy consumed in producing
Q195: Discuss how equivalent units are computed under
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents