True/False
Measurements for building layout should follow the slope of the site.
Correct Answer:
Verified
Related Questions
Q6: To detect a laser beam, a battery
Q7: The compensator in an automatic level uses
Q8: A(n) _ is a device that releases
Q9: Any line whose points are the same
Q10: Rotating leveling screws of a transit is
Q12: Water seeks its own level.
Q13: The vertical cross hair of a telescope
Q14: After leveling a transit-level over the point
Q15: Grading the building site to drain water
Q16: The strings of a set of batter
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents