Verification of wind turbine control system safety switches should be performed during each preventative maintenance cycle.
Correct Answer:
Verified
Q3: Inspection of control console electrical connections should
Q4: The acronym DTA stands for Driving to
Q5: A tower foundation rod "strike test" should
Q6: Cooling systems utilized with power electronics may
Q7: Wind turbine foundations are generaly rock anchor
Q9: Inspection of DTA blind areas should be
Q10: The first step in a DTA control
Q11: The power conversion system for all wind
Q12: Preventative maintenance activites for the DTA may
Q13: The PC enables the wind farm SCADA