In the cut-and-fill method, ____.
A) benches are cut into a hillside
B) material is removed from the up a slope and placed at the base
C) retaining walls are constructed and anchored into bedrock
D) rock bolts are fastened to stable bedrock
E) material is removed from the base of a slope
Correct Answer:
Verified
Q30: Which type of mass movement is most
Q31: _ maps help planners and developers make
Q32: When clays liquefy and flow like water,
Q33: _ is an example of a slide
Q34: Scarps are _.
A)crescent shaped areas where material
Q36: Why does benching reduce the risk of
Q37: Which of the following is a rapid
Q38: What type of mass wasting is responsible
Q39: What term describes multiple types of mass
Q40: The primary cause of slumps is _.
A)overburdening
B)removal
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents