When estimating finish hardware, a ____ is often specified on larger projects; otherwise a finish hardware price is obtained from a subcontractor.
A) cash allowance
B) cash overrun
C) cash shortage
D) cash requirement
Correct Answer:
Verified
Q10: Items of lumber are classified in terms
Q11: The _ is a wide-ranging trade section
Q12: Materials for finish carpentry on a commercial
Q13: A 1000-board feet unit is written _.
A)MBF
B)KBF
C)BFK
D)MBM
Q14: Ridge blocking is measured along the ridge
Q15: All of the following are considered finish
Q16: Pieces of board less than 1 inch
Q17: Sheathing and siding are measured in square
Q19: On most projects a _ will be
Q20: The unit of measurement of lumber is