Very little information is required about a new project to prepare an estimate using ____ analysis.
A) assembly
B) elemental
C) labor
D) unit
Correct Answer:
Verified
Q10: An elemental cost analysis of a finished
Q11: In order to obtain a realistic assessment
Q12: When a developer first considers the idea
Q13: When using an elemental analysis as an
Q14: The _ contingency is an amount that
Q16: A trade breakdown is not detailed enough
Q17: An element represents a component that always
Q18: The _ is the cost of the
Q19: The _ UniFormat is a function-based elemental
Q20: All that is required to prepare a