Tracking productivity rates separately from prices also has the advantage of "____"-the same productivity rates can be used in different localities, only the wage rates have to be adjusted to reflect pay rates that differ from place to place.
A) transportability
B) availability
C) transparency
D) efficiency
Correct Answer:
Verified
Q6: Whenever it is possible, the contractor will
Q7: Generally a large project causes crews and
Q8: _ are used when loads that are
Q9: The cost of transporting equipment includes the
Q10: Material prices for backfill have three main
Q12: Transportation of major items of equipment-backhoes, bulldozers,
Q13: Excavation contractors tend to concentrate on a
Q14: The cost of transporting minor items of
Q15: Which of the following types of excavation
Q16: When soil or gravel is excavated, the
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents