Mike, a plumbing contractor, was hired to correct a stoppage in the sewer line at Sarah's house. During his work, he discovered numerous leaks in a rusty, defective water pipe that ran parallel with the sewer line. To meet public regulations, the water pipe had to be replaced either then or later, when the yard would have to be redug. Mike replaced the water pipe and Sarah inspected the work daily and did not object to the extra work. When Mike finished, Sarah refused to pay for the water pipe replacement since that was not what she originally hired Mike to do and she had never specifically agreed to that work. Sarah must pay Mike for his labor and materials costs for both the sewer and water line repair.
Correct Answer:
Verified
Q20: A quasi contract is another name for
Q21: Alice makes a material misrepresentation of fact
Q22: Matt says to Lynn, "If you will
Q23: A contract in which both parties exchange
Q24: The court in the Weichert Co. Realtors
Q26: The Weichert Co. Realtors v. Ryan case
Q27: Caroline signs a contract to work as
Q28: James offers to sell his fishing boat
Q29: The requirement that each party to a
Q30: George has been declared incompetent by the
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents