The ____ system consists of a series of concrete joists cast at right angles to each other to form a grid.
A) two-way flat plate
B) two-way solid slab
C) two-way joist framing
D) one-way solid slab
Correct Answer:
Verified
Q10: _ construction utilizes a flat slab supported
Q11: _ is a form of site-cast concrete.
A)
Q12: Describe the purpose of snap ties in
Q13: _ construction has the slab supported on
Q14: Describe ICF forms and how they are
Q16: Describe how cast-in-place concrete is produced on
Q17: Concrete is usually prepared in _.
A) batches
B)
Q18: Describe one-way solid slab construction and the
Q19: Describe continuous beam casting as it relates
Q20: _ may rest on a continuous concrete