To meet the requirements of NEC 110.9 and 110.10, it is absolutely necessary to determine the available fault currents at various points on the electrical system. If a ____ study is not done, the selection of overcurrent devices may be in error, resulting in a hazard to life and property.
A) short-circuit
B) transformer multiplier
C) line-to-line voltage
D) line-to-line wattage
Correct Answer:
Verified
Q1: What is the importance of selective coordination?
Q2: The transformer multiplier M2 is calculated using
Q3: _ can prevent the occurrence of single
Q5: The actual impedance value on a UL-listed
Q6: How can you create a selective system
Q7: How can you create a selective system
Q8: Under what conditions are series-rated systems most
Q9: The amount of available short-circuit current decreases
Q10: If non-series-rated overcurrent devices (standard molded-case circuit
Q11: The NEC includes a requirement that the
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents