A visual depiction of the subassemblies and components that are needed to produce and/or assemble a product is called a(n)
A) assembly time chart.
B) product structure tree.
C) MRP II.
D) pegging.
E) Gantt chart.
Correct Answer:
Verified
Q46: The identification of parent items that have
Q47: A computer-based information system designed to handle
Q48: In MRP, under lot-for-lot ordering, planned-order receipts
Q49: Under lot-for-lot, order sizes for component parts
Q50: An MRP system whose records are updated
Q52: The MRP input storing information on the
Q53: In MRP, the gross requirements of a
Q54: Which one of the following is not
Q55: The MRP input listing the assemblies, subassemblies,
Q56: An MRP system that is updated periodically