In theory of constraints scheduling, the synchronization of the sequence of operations is referred to as the
A) buffer.
B) bottleneck.
C) constraint.
D) rope.
E) drum.
Correct Answer:
Verified
Q31: Primary considerations in scheduling high-volume systems involve:
(I)coordinating
Q32: Ensuring that the constraining resource is used
Q33: The SPT priority rule always results in
Q34: Priority rules generally assume that job setup
Q35: Priority rules are widely used to sequence
Q37: The theory of constraints has a goal
Q38: Which of the following is present in
Q39: Makespan is the total time needed to
Q40: In the decision-making hierarchy, scheduling decisions are
Q41: The two different approaches to load work
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents