In theory of constraints scheduling, the __________ refers to the schedule and the __________ refers to inventory used to ensure that the bottleneck is never idle.
A) rope; drum
B) drum; rope
C) drum; buffer
D) buffer; drum
E) buffer; rope
Correct Answer:
Verified
Q19: A schedule chart depicts the loading and
Q20: When operations are often bottlenecked, additional planned
Q21: Which of the following is the last
Q22: Which of the following is not an
Q23: To facilitate utilization of bottleneck operations, in
Q25: In a single work center, makespan improvement
Q26: Which of the following is not usually
Q27: Priority rules are used in low-volume systems
Q28: Scheduling pertains to
A)hiring workers.
B)process selection.
C)buying machinery.
D)timing the
Q29: The Hungarian method is limited to a
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents