Flexible resources are a basic element of lean production.
Correct Answer:
Verified
Q3: Advantages of small-lot production include requiring less
Q5: Small-lot production reduces lead time but increases
Q21: One benefit of small lot production is
Q23: The concept of cellular layouts was developed
Q25: One component of lead time,setup time,is often
Q31: The pull system was developed by Ohno
Q33: Reducing variability in production through more accurate
Q34: The output of a manufacturing cell is
Q34: In lean production,a strong relationship exists between
Q36: Setup time is not a component of
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents